ASTEC - ASPHALT ROOF

Dade County Public Schools (DCPS) had issues with this roof since the day it was installed. It was considered the worst roof in the district. The school’s chiller unit sits on it, so the roof has multiple penetrations & constant ponding water. It was a roof that DCPS stated “leaked on an annual to bi-annual basis due to the constant vibrations of the chiller unit on a concrete roof deck.”

In 2010, Foster Construction Group, Inc. applied the ASTEC System and the roof has not leaked since!

Project

Dade County Public Schools

Location

Miami Beach

Industry

ASTEC

Category

Roof · Waterproofing · Asphalt Modified-Bitumen

SQ FT

840

Duration

7 days